Graphics Programs Reference
In-Depth Information
IntheProjectSettingsViewstab,noticethered-coloredboxnexttotheLeftview
and a green-colored box next to the Right view. These colors are reflected in the
ViewsbuttonsintheViewerand,ifyouchecktheUseColorsInUIbox,theywill
be used to color the pipes connecting left and right specific parts of your trees.
Now that you've set up the multi-view project, you can proceed to connect your
two Read nodes together into one multi-view stream.
All view-specific nodes are held in the Views toolbox in the Node toolbar. You
use the node called JoinViews to connect separate views into one stream.
4. With nothing selected in the DAG, click JoinViews from the Views toolbox to
create one.
5. Connect JoinViews1's left input to Read1 and the right input to Read2 ( FIGURE
8.21 ) .
Figure 8.21. Connecting two streams into the beginnings of a multi-view
tree.
 
Search WWH ::




Custom Search