L
B
27 44
9 15
.
.
H
B
36 6
9 15
.
For H
:
=
=
3 0
.
;
=
=
4 0
.
2
.
Hence I
p
=
0.475.
L
B
H
B
6 1
9 15
.
For H
:
=
3 0
.
;
=
=
0 67
.
1
.
Hence I
p
=
0.18.
Settlement under centre of foundation (
note
as heave effects will be allowed for, use
gross contact pressure. If heave is not allowed for net foundation pressure should be
used).
pB
E
(
1
2
)
4
I
Rigidity factor
ρ
=
−
ν
×
i
p
350
16100
=
×
9 15 0 75 4 0 475
.
×
.
×
(
.
−
0 18
.
)
×
0 8
.
=
0 141
.
m
=
141
mm
Heave effects: relief of pressure due to sand excavation
=
29 kPa
29
64 400
⇒
Heave
=
×
9 15 0 75 4 0 475 0 18
.
×
.
×
(
.
−
.
)
×
0 8
.
=
0 0029
.
m
=
3
mm
Hence
ρ
i
in the clay
=
138 mm.
As can be seen from this example the effects of heave are usually only significant
when a great depth of material is excavated.
Consolidation settlement
The clay layer has been divided into five layers of thickness, H, equal to 6.1 m.
m
v
Δ
σ
z
m
v
Δ
σ
z
H
0.000145
261
0.231
0.000114
195
0.136
0.0000413
145
0.081
0.000073
110
0.049
0.0000456
86
0.024
0.521 m
=
521 mm
This value of settlement can be reduced by the factor
µ
= + −
A
(
1
A
)
α
Hence:
α
=
0.26
μ
=
0.75
+
0.25
×
0.26
=
0.82
ρ
c
=
521
×
0.82
=
448 mm
Total settlement
=
62
+
138
+
448
=
648 mm