the total settlement of the foundation under its centre if the groundwater level occurs
at a depth of 5 m below the top of the layer.
Solution
The vertical pressure increment at the centre of the layer can be obtained by splitting
the plan area into four rectangles (Fig. 11.11a ) and using Fig. 3.10:
σ 1
=
110
kPa
In order to obtain the E value for the soil, Δ σ 3 should now be evaluated so that the
deviator stress ( Δ σ 1     Δ σ 3 ) can be obtained.
Alternatively the approximate method can be used:
65% of maximum deviator stress  =  0.65  ×  400  =  260 kPa
Strain at this value  =  0.8% (from Fig. 11.11b )
Hence:
260 100
0 8
×
E
=
=
32 500
kPa
=
32 5
.
MPa
.
Immediate settlement
Using the rectangles of Fig. 11.11a and Fig. 11.2:
L
B
15
5
H
B
20
5
=
=
3 0
.
=
=
4 0
.
Hence:
I p =
0 48 4 0
.
×
.
=
1 92
.
(
)
pB
1
ν
2
I
p
ρ
if =
E
200
32 500
=
× ×
5 0 75 1 92 0 8
.
×
.
×
.
(
0 8
.
=
rigidity facto
r
)
0 036
.
m
36
mm
=
=
Consolidation settlement
Initial effective overburden pressure
=
18 5 10 9 81 5
136
.
× −
.
×
=
kP
a
Hence the range of pressure involved is from 136 to 246 kPa.
Using the e-p curve of Fig. 11.8a :
e
=
0 6800
.
;
e
=
0 666
.
1
2
de
dp
0 680 0 666
110
.
.
0 014
110
.
a
=
=
=
=
0 000 127
.
m /kN
2
a
0 000 127
1 680
.
m
v =
=
=
7 6 10
.
×
5
m /kN
2
1
e
.
+
1
ρ c
=
m dp H
=
7 6 110 20 10
.
×
× ×
5
=
0 167
.
m
=
167
mm
Total settlement  =  36  +  167  =  203 mm
Some reduction could possibly be applied to the value of ρ c if the value of μ was known.
 