Geology Reference
In-Depth Information
Peck, R.B., Hanson, W.E. & Thornburn, T.H. 1994. Foundation Engineering, 2nd
edition. New York: John Wiley and Sons, 514p.
Petley, D. 2011 (ongoing). Dave
'
s Landslide Blog.
http://daveslandslideblog.blogspot.
com/
Pettifer, G.S. & Fookes, P.G. 1994. A revision of the graphical method for assessing
the excavatability of rock. Quarterly Journal of Engineering Geology, 27, 145
164.
Phillips, F.C. 1973. The Use of Stereographic Projection in Structural Geology, 3rd
edition. London: Edward Arnold, 90p.
Phillipson, H.B. & Chipp, P.N. 1982. Air foam sampling of residual soils in Hong
Kong. Proceedings of the ASCE Specialty Conference on Engineering and
Construction in Tropical and Residual Soils, Honolulu, 339
-
356.
PIANC 2000. Site Investigation Requirements for Dredging Works. Report of
Working Group No. 23 of the Permanent Technical Committee II, International
Navigation Association, 32p.
Picarelli, L. &Di Maio, C. 2010. Deterioration processes of hard clays and clay shales.
In Weathering as a Predisposing Factor to Slope Movements, Calceterra, D. &
Parise, M. (eds.), Geological Society, London: Engineering Geology Special
Publications, 23, 15
-
32.
Pierson, T.C. 1983. Soil pipes and slope stability. Quarterly Journal of Engineering
Geology, 16, 1
-
15.
Pine, R.J. & Roberds, W. J. 2005. A risk-based approach for the design of rock slopes
subject to multiple failure modes
-
illustrated by a case study in Hong Kong.
International Journal of Rock Mechanics & Mining Sciences, 42, 261
-
275.
Pinho, A., Rodrigues-Carvalho, J.A., Gomes, C.F. &Duarte, I.M. 2006. Overview of
the evaluation of the state of rock weathering by visual inspection. 10th IAEG
Congress, Engineering Geology for Tomorrow
-
s Cities, Nottingham, Paper 260.
Pirazzoli, P.A. 1996. Sea-Level Changes. The Last 20000 Years. Chichester: John
Wiley & Sons, 211p.
Piteau, D.R. 1973. Characterising and extrapolating rock joint properties in engineer-
ing practice. Rock Mechanics, Supplement 2, 2
'
31.
Pollard, D.D. & Aydin, A. 1988. Progress in understanding jointing over the past
century. Geological Society America Bulletin, 100, 1181
-
-
1204.
Pope, R.G., Weeks, R.C. & Chipp, P.N. 1982. Automatic recording of standpipe
piezometers. Proceedings of the 7th Southeast Asian Geotechnical Conference,
Hong Kong, 1, 77
89.
Pöschl, I. & Kleberger, J. 2004 Geotechnical risk in rock mass characterisation
-
a
concept. Course on Geotechnical Risks in Rock Tunnelling, Aveiro, Portugal, April,
11p.
Poulos, H.G. 2005. Pile behavior
-
consequences of geological and construction
imperfections. 40th Terzaghi Lecture, Journal Geotechnical & Geoenvironmental
Engineering, ASCE, 131, 538
-
563.
Powderham, A.J. 1994. An overview of the observational method: development in cut
and cover and bored tunnelling projects. Géotechnique, 44, 619
-
636.
Power, C.M. 1998. Mechanics of Modelled Rock Joints under True Stress Conditions
Determined by Electrical Measurements of Contact Area. Unpublished PhD thesis,
University of Leeds, 293p.
Power, C.M. &Hencher, S.R. 1996. A new experimental method for the study of real
area of contact between joint walls during shear. Rock Mechanics, Proceedings 2nd
North American Rock Mechanics Symposium, Montreal, 1217
-
1222.
Power, M.S., Rosidi, D., Kaneshiro, J.Y. 1998. Seismic vulnerability of tunnels and
underground structures revisited. In North American Tunneling, Ozdemir, L. (ed.),
Rotterdam: Balkema, 243
-
250.
Preene, M. & Brassington, F.C. 2003. Potential groundwater impacts from civil
engineering works. Water & Environment Journal, 17, 59
-
-
64.