Geology Reference
In-Depth Information
MacGregor, F., Fell, R., Mostyn, G.R., Hocking, G. &McNally, G. 1994. The estima-
tion of rock rippability. Quarterly Journal of Engineering Geology, 27, 123
-
144.
McCabe, B.A., Nimmons G.J. & Egan, D. 2009. A review of
field performance of
stone columns in soft soils. Proceedings of the Institution of Civil Engineers:
Geotechnical Engineering, 162, 323
334.
McGown, A., Marsland, A., Radwan, A.M. & Gabr, A.W.A. 1980. Recording and
interpreting soil macrofabric data. Géotechnique, 30, 4, 417
-
447.
McLearie, D.D., Forekman, W., Hansmire, W.H. & Tong, E.K.H. 2001. Hong Kong
Strategic Sewage Disposal Scheme Stage 1 deep tunnels. 2001 RETC Proceedings,
487
-
-
498.
McMahon, B.K. 1985. Geotechnical design in the face of uncertainty. Journal of the
Australian Geomechanics Society, 10, 7
19.
McNicholl, D.P., Pump, W.L. & Cho, G.W.F. 1986. Groundwater control in large
scale slope excavations
-
five case histories from Hong Kong. In Groundwater in
Engineering Geology, Cripps, J.C. et al. (eds.), Geological Society, Engineering
Geology Special Publication no. 3, 561
-
576.
Mead, L. & Austin, G.S. 2005. Dimension stone. Industrial Minerals and Rocks, 7th
edition. Littleton CO: AIME-Society of Mining Engineers, 907
-
923.
Megaw, T.M. & Bartlett, J.V. 1981. Tunnels: Planning, Design, Construction,
Volume 1. New York: Ellis Horwood Limited, 284p.
Menard, L. & Broise, Y. 1975. Theoretical and practical aspects of dynamic
consolidation. Géotechnique, 25, 3
-
-
18.
Michie, U. 1996. The geological
eld area and its
relationship to hydrogeology. Quarterly Journal of Engineering Geology, 29,
S13
framework of
the Sella
S28.
Mikkelsen, P.E. & Green, G.E. 2003. Piezometers in fully grouted boreholes.
Proceedings Symposium on Field Measurements in Geomechanics, Oslo, 1
-
10.
Montgomery, D.R., Dietrich, W.E. & Heffner, J.T. 2002. Piezometric response in
shallow bedrock at CB1: Implications for runoff generation and landsliding. Water
Resource Research, 38, 12, 1274, 10-1
-
10-18.
Moore, R. & Brunsden, D. 1996. A physico-chemical mechanism of seasonal mudslid-
ing. Géotechnique, 46, 259
-
-
278.
Moore, R., Hencher, S.R. &Evans, N.C. 2001. An approach for area and site-speci
c
natural terrain hazard and risk assessment, Hong Kong. Proc. 14th SEA Geotech.
Conference, Hong Kong, 155
60.
Morgenstern, N.R. 2000. Common ground. Proceedings of GeoEng 2000,
Melbourne, Australia, 1, 1
-
30.
Morgenstern, N.R. & Price, V.E. 1965. The analysis of the stability of general slip
surfaces. Géotechnique, 15, 79 - 93.
Moye, D.G. 1955. Engineering Geology for the Snowy Mountains scheme. Journal of
the Institution of Engineers, Australia, 27, 287
-
298.
Muir, T.R.C., Smethurst, B.K. & Finn, R.P. 1986. Design and construction of high
rock cuts for the Kornhill Development, Hong Kong. Proceedings of Conference on
Rock Engineering and Excavation in an Urban Environment, Hong Kong,
Institution of Mining and Metallurgy, 309
-
329.
Muir Wood, A. 2000. Tunnelling: Management by Design. London: E&FN Spon, 320p.
Murray, A.D. & Gray, A.M. 1997. The Pergau Hydroelectric Project Part 3: civil
engineering design. Proceedings institution Civil Engineers Water, Maritime &
Energy, 124, 173
-
188.
Newmark, N.M. 1965. Effects of earthquakes on dams and embankments.
Géotechnique, 2, 139
-
160.
New Zealand Geotechnical Society 2005. Field Description of Soil and Rock. 36p.
Nichols, T.C. Jr. 1980. Rebound, its nature and effect on engineering works.
Quarterly Journal of Engineering Geology, 13, 133
-
-
152.
Search WWH ::




Custom Search