Geology Reference
In-Depth Information
(continued)
Hazard
Possible mitigation measures prior to
and during construction to reduce
likelihood or consequence of hazard
Impact of
mitigation
measures and
risk
Summary of main
residual risks
Title
Example of
circumstances
Notes * indicates technique more likely
than others to be useful
10. provision of adequate ventilation
(and if necessary methane drainage
system )*
11. adoption of
ammable gas working
practices (no smoking policy, safety
light policies, intrinsically safe plant
and equipment
12. consider also likelihood of hazards:
1, 3, 4, 5, 7, 8, 9, 10, 11, 12 and 17
3
Noxious gases (eg
CO2, S02, H2S
as 1 above
M
1. GI boreholes
2. pre-construction geological desk
study and risk assessment *
3. geological mapping of face cuttings
to detect changes in structure and
strata, presence of organic material,
sulphides, etc *
4. monitoring of tunnel atmosphere
(gas monitoring at top and base of
face) to detect signi
L
L
L
1. failure to identify gases
2. injury to workforce
3. temporary evacuation of
drive during remedial
works
cant changes in
character or composition *
5. probe drilling ahead of and around
the face through TBM head.
Monitoring of character of
ush
return
6. provision of adequate ventilation *
7. consider also presence of hazard 2
continued overleaf
 
Search WWH ::