Information Technology Reference
In-Depth Information
1200
34
33.5
1000
33
800
32.5
32
600
31.5
400
31
30.5
200
30
0
29.5
0
20
40
60
80
100
120
0
20
40
60
80
100
120
Sampling period
Sampling period
Fig. 7. G and T changes form 7.a.m. to 17.p.m. on 7.21.2012
Fig. 8. The output current and output power tracked their reference respectively
At last, the operating point trajectory should be compared with the I-P and
U-I curves to test whether the PV system is working on the MPP. As the Fig.9
shows, the PV system works on the theoretical MPP even though the environ-
ment keeps changing.
I−P
U−I
200
12
G=300
G=400
G=500
G=600
G=700
G=800
G=900
G=1000
G=1100
Pout
G=300
G=400
G=500
G=600
G=700
G=800
G=900
G=1000
G=1100
Pout
180
10
160
140
8
120
100
6
80
4
60
40
2
20
0
0
0
2
4
6
8
10
0
5
10
15
20
25
30
Array Current(A)
Array Voltage(V)
Fig. 9. Operation points on I-P and U-I curves
Search WWH ::




Custom Search