Environmental Engineering Reference
In-Depth Information
Figure 7. Experimental Installation Schema.
Figure 8. Experimental Facility.
Thus, the air expelled from the room goes through the EC in a cross-flow, until it leaves
in the upper part, when it is impulsed into the heat pipe in a cross-flow in relation to the
primary airstream, ensuring non-dispersion of Legionella in the expelled air, which might
carry aerosols. After passing through the HP, it is impulsed to the exterior heat pump unit,
thus obtaining a three-recovering configuration.
Search WWH ::




Custom Search