Graphics Programs Reference
In-Depth Information
3. Select the Ex_3_7 proposal.
You should see the model as it would appear at the end of Exercise
3.6 with the new buildings created.
4. Click Bookmarks on the Utility Bar to open the Bookmarks panel.
5. Click Industrial Park. InfraWorks will zoom to an area overlooking
the industrial park.
6. Zoom in to the building that is located within the southernmost
parking lot.
7. Click the building to select it. If the gizmos do not appear, right-click
and select Edit.
8. Right-click the vertex gizmo that creates the angle point on the east
side of the building. Click Remove Vertex from the shortcut menu.
9. Click the height gizmo and enter a value of 150 ( 45 ) in the tooltip.
Press Enter. Press Esc to clear the selection of the building.
The building should now look similar to what is shown in FigureĀ 3.41.
fIgureĀ 3.41 An extra vertex has been removed and the height of the building
has been changed using the height gizmo.
10. Pan north to the building located at the south end of the long narrow
parking lot. Click the building.
11. Right-click the building and select Exit Edit Mode.
12. Right-click the building again and select Duplicate.
A preview of a copy of the building will follow your cursor as you
move it.
Search WWH ::




Custom Search