Figure 10.2
Installation of Bonus 55kW prototype with Økær blades,
1981, Ydby, Denmark. The prototype was developed with
consultancy from Preben Maegaard and belonged to Asger
Maegaard Kristensen . Later AeroStar blades were used but
after the bankrupcy of the AeroStar manufacturer DCER in
1986, LM Glasfiber blades were used.
On 1 August 1981 we employed the first engineer. We also
engaged a part-time consultant to assist us in the Californian
market. The first six wind turbines were installed in California in
December1982.
Figure 10.3
Danregn(=Danishrain)headquartersinBrande(Photo:Jens-
Chr.Kjaer,1982).