resolution
evaluation
cummul ati ve
Fig. 4. Duration of tasks per lifecycle phase (not analyzed cases)
5.2 Drop in Duration of Tasks
On the other hand, the duration of the Resolution task significantly drops in the Im-
plementation and Component and Integration testing phases, while the duration of the
Analysis and Evaluation task increases. The decrease of the Resolution could be ex-
plained by the fact that the project had a fixed deadline. It was not possible to spend
more time on the Resolution activity because of the fact that more time was simply
not available. This hypothesis was also given by the organization that provided us
with information prior to our analysis. However, this hypothesis does not explain the
increase of the duration of the Evaluation task
5.3 Total Throughput Time
Considering the total throughput time of a case, the throughput time is the highest
during the Specification, Design, System testing, Customer testing and Consumer use
 