Biomedical Engineering Reference
In-Depth Information
LEVEL 3
SOP No.:
Issued on:
Revision No.:
Initiator Name:
ANNEXURE III
CHECKLIST FOR BATCH DOCUMENTS
ALONG WITH SAMPLES
(FINISHED PRODUCT)
Product:
Mfg.:
Code No.:
Expiry:
Batch No.:
Consignee:
Stage: Finished
Status: Partial/Complete
Packaging Area Documents
1. Batch packaging record number 1
2. Batch packaging record
a.
Hand packing
b.
Filling and packing
3. Line clearance format
4. First signed coded commodities
5. Reconciliation form (labels/cartons)
6. Packaging report and the release of finished product
7. Packaging material requisition
8. Time sheet
QA In-Process
1. Sampling report (manufacturing side)
2. QA in-process record
a.
QA filling chart
b.
QA final packaging records (for different consignee)
c.
Inspection start-up checklist with release label
Any Other Documents
1. Process change request
2. Memo (sorting or any other)
3. Repacking request/requisition
4.
Remarks:
Checked and sent by:
Date:
Original to QC along samples and documents
cc: QA (In-Process)/Packaging/Production/Stores
 
Search WWH ::




Custom Search