Biomedical Engineering Reference
In-Depth Information
LEVEL 3
SOP No.:
Issued on:
Revision No.:
Initiator Name:
ANNEXURE III
CHECKLIST FOR BATCH DOCUMENTS
ALONG WITH SAMPLES
(FINISHED PRODUCT)
Product:
Mfg.:
Code No.:
Expiry:
Batch No.:
Consignee:
Stage:
Finished
Status:
Partial/Complete
Packaging Area Documents
1. Batch packaging record number 1
∙
2. Batch packaging record
a.
Hand packing
∙
b.
Filling and packing
∙
3. Line clearance format
∙
4. First signed coded commodities
∙
5. Reconciliation form (labels/cartons)
∙
6. Packaging report and the release of finished product
∙
7. Packaging material requisition
∙
8. Time sheet
∙
QA In-Process
1. Sampling report (manufacturing side)
∙
2. QA in-process record
∙
a.
QA filling chart
∙
b.
QA final packaging records (for different consignee)
∙
c.
Inspection start-up checklist with release label
∙
Any Other Documents
1. Process change request
∙
2. Memo (sorting or any other)
∙
3. Repacking request/requisition
∙
4.
Remarks:
Checked and sent by:
Date:
Original to QC along samples and documents
cc: QA (In-Process)/Packaging/Production/Stores
Search WWH ::
Custom Search