Attachment Vj
SOP No.: QAS-002
Revision No.:
Issued on:
Initiator sign:
Production Area Documents
Check the:
1. Inspection start-up check list with the release
label (manufacturing side)
2. Batch manufacturing record for
a.
Granulation and final mixing: On the
batch manufacturing record for the
granulation and final mixing check that
i. All the information regarding the
identity of batch is correct
ii. Record is duly signed by the
manufacturing supervisor
iii. Information related to machine
cleaning is complete with the
signatures of the worker
iv. Yield calculation is correct
v. Temperatures and timings mentioned
are as per MFM and are matching
with the Lytzen Oven Chart (in case
if the drying is done on the tray dryer)
b.
Charts ( if drying on Lytzen dryer ):
Check the presence of the Lytzen dryer
charts if the drying of granules was
carried out in the Lytzen Oven and the
temperature at which the granules were
dried was comparable to the limits
provided in the MFM
3. Was there any deviation from MFM, was
any corrective action taken, was it properly
documented, was PCR raised and made
a part of the batch document?
Remarks:
4. Batch yield final and at various in-process
stage is correct
5. Rejection verification at various stages
of processing and at final stage
Reviewed by: