Biomedical Engineering Reference
In-Depth Information
Attachment Vi
SOP No.: QAS-002
Revision No.:
Issued on:
Initiator sign:
Manufacturing/Production Area Documents
Check the:
1. Inspection start-up check list with the release
label (manufacturing side)
2. Batch manufacturing record for
a.
Granulation and final mixing: On the
batch manufacturing record for the
granulation and final mixing check that
i. All the information regarding the
identity of the batch is correct
ii. Record is duly signed by the
manufacturing supervisor
iii. Information related to machine
cleaning is complete with the
signatures of the worker
iv. Yield calculation is correct
v. Temperatures and timings
mentioned are as per MFM and are
matching with the Lytzen Oven
Chart (in case if the drying is done
on the tray dryer)
b.
Capsule filling (wt. variation chart)
i. Information regarding the identity
of the batch is correct
ii. Record is duly signed by the
manufacturing supervisor
iii. Information related to the machine
cleaning is complete with the
signatures of the worker
iv. Yield calculation is correct
Page 2 of 7
 
Search WWH ::




Custom Search