Civil Engineering Reference
In-Depth Information
FIGURE 5.8
Optimized forging sequence with marks: preforming operation, beginning and end.
Optimized forging sequence with marks: an intermediate step of the last forging operation with a
zoom in the previously folded area and the end of the last forging operation.
FIGURE 5.9
 
Search WWH ::




Custom Search