Agriculture Reference
In-Depth Information
Step 5: Level and Square Frames -
Set the frame section aside and begin removing soil.
This step is similar to Steps 3 and 4 in
Section 4
, but since there is a definite uphill side, it
is easy to determine high and low areas. The soil on the uphill side is broken up and the soil
Figure 57
).
Iftheuphillendofthebedframesectionisleftopen,takecaretokeeptheboxsquare.Item-
porarily attached a furring strip to hold the box square and eventually replaced it and closed
the end of the box with a section of 2x4.
After both sides of the frame section is level and the frame is also level from side to side,
add the next frame section and continue.