Agriculture Reference
In-Depth Information
Step 4: Place Bed Frames in Position One at a Time -
Place the first raised bed frame
section into place at the top of the slope to mark where the soil needs to be removed to level
the frame section (
Figure 54
).
Figure 54.
First Bed Frame Section in Place Before Leveling.