Agriculture Reference
In-Depth Information
Step 4: Place Bed Frames in Position One at a Time - Place the first raised bed frame
section into place at the top of the slope to mark where the soil needs to be removed to level
the frame section ( Figure 54 ).
Figure 54. First Bed Frame Section in Place Before Leveling.
 
Search WWH ::




Custom Search