Environmental Engineering Reference
In-Depth Information
TABLE 22.2
Mean.Pseudo-Total.(HNO 3 -Extractable).
Concentrations.of.Trace.Elements.in.
Soil.at.One.Location.on.the.Warrington.
Brownield.Site.and.in.the.Canal.
Sediment.(mg/kg)
BrownieldSite
CanalSediment
As
37
145
Cr
40
1315
Cd
4.3
<1
Ni
38
102
Zn
172
4858
Pb
179
1887
Cu
83
887
FIGURE 22.6
The.canal.before.and.after.engineering.work.
providing. a. pollution. linkage. to. receptors. (groundwater. contamination.
and. entrainment. of. airborne. dust. particulates).. Adjacent. brownield. land.
contained. mean. trace. element. concentrations. that. were. only. marginally.
elevated. (Table. 22.2),. although. spatial. patterns. were. heterogeneous. with.
localized. hotspots. of. trace. elements. (Figure. 22.7). as. usually. found. on.
brownield.land.(French.et.al..2006).
The.restoration.work.involved.extensive.engineering.of.the.canal,.which.
was.narrowed.through.dredging,.stabilization,.and.relocation.of.the.sedi-
ment.to.the.edges.of.the.canal.basin,.retained.by.geotextile-lined.gabions,.
and. covered. by. recycled. soil. forming. materials,. including. green. waste.
compost. (Figure. 22.4).. A. water. low. was. created. in. the. new. open. water.
section.of.the.narrowed.canal.and.an.artiicial.wetland.was.established.to.
receive.downstream.outlow..Habitat.improvement.of.the.adjacent.brown-
ield. land. was. restricted. to. raised. walkways. and. some. import. of. green.
waste.compost..The.project.was.completed.in.2010.but.it.may.be.too.early.