Civil Engineering Reference
In-Depth Information
If Equations (7.81), (7.82), and (7.83) are not satisfied, the location of the
inelastic centroid is updated by EAM/EA , and steps 5 to 11 are repeated
until Equations (7.81), (7.82), and (7.83) are satisfied.
YY EAM
EA
ol =+
(7.8 4)
c
c
new
Once equilibrium is reached, the alg ori thm checks for ultimate strain in
concrete ε ec and steel ε es not to exceed ε cu and 0.05, respectively, and then
it increases the loading by ΔGP and runs the analysis for th e n ew load level
using the latest section properties. Otherwise, if ε ec equals ε cu or ε es equals
0.05, the target force and resultant moment are reached as a point on the
interaction diagram for the amount of eccentricity used. For more details
about this procedure, check the work of Rasheed and Dinno (1994) and Abd
El Fattah, Rasheed, and Esmaeily (2011).
Example 7.1: Analysis
One of the columns that were tested by Eid, Roy, and Paultre (2009) is investigated
in this example. The following are the properties of the column:
Diameter
11.9 in.
303 mm
Clear cover
1 in.
25 mm
f c
4.59 ksi
31.7 MPa
n × t f
2 × 0.015 in.
2 × 0.381 mm
E f
11, 30 6 k si
78,000 MPa
ε fu
0.013
0.013
f yt
66.1 k si
456 MPa
Hoop spacing
3.94 in.
100 mm
Hoop diameter
#3
9.5 mm
Longitudinal bars
6 #5
6 ϕ 15.9 mm
f y
61.3 k si
423 MPa
Draw the interaction diagram per ACI 440.2R-08 then use KDOT Column
Expert.
Solution:
Using Equation (7.7):
2
nt E
D
ε
= ×× ×
2
20.015
11306
×
0.586
×
0.013
fffe
f
=
=
0.4343ksi
l
11.9
f
f
0.4343
4.59
l
=
=
0.095
>
0.08, stress-strain curve is ascending
c
Search WWH ::




Custom Search