Environmental Engineering Reference
In-Depth Information
Liquid chlorine feed rate calculations (chlorinator
settings).
Liquid chlorine
feed rate (lb/day)
Water fill rate
(gpm) total
(c3-1)
=
0.3
×
Ops Tip
Numbers in the calculators are combined constants. In this
case, 0.3 comes from 25 mg/L
×
3.785 L/gal
×
g/1,000 mg
×
lb/454 g
×
60 min/hr
×
24 hr/day.
Liquid chlorine
feed rate (g/hr)
Water fill rate
(L/sec) total
(c3-2)
=
90
×
Chlorine solution feed rate calculations.
Chlorine
solution feed
rate (mL/min)
Water fill
rate (gpm)
total
Strength of
chlorine
feed solution (%)
(c3-3)
=9.46
×
÷
Chlorine
solution feed
rate (gal/hr)
Water fill
rate (gpm)
total
Strength of
chlorine
feed solution (%)
(c3-4)
=0.15
×
÷
Chlorine
solution feed
rate (mL/min)
Strength of
chlorine
feed solution (%)
(c3-5)
Water fill
rate (L/sec)
total
=
150
×
÷