velocity and discharge of the flow during storm. Though in some cases jhora
training is practiced and proved to be successful, the training of all the jhoras is yet
to be achieved. After the massive destruction in May, 2011 at Lower Paglajhora,
along the main nala which was passing through the slided area was trained with
concrete small steps to arrest the percolation or seepage of channel water (Fig. 8.3 ).