FIGURE 7.48 Flare jacket configuration and location of grouting.
Human access to the underside roller-bearing deck was required for attach-
ing beam clamps to support the weight of the new brace members during instal-
lation. Scaffolding to enable safe access to these locations from the flare bridge
and to provide a working platform was constructed prior to the start of repair
operations.
Repairs were carried out in the following sequence:
1. Pile wall-thickness survey
2. Refurbishment of roller bearings
3. Grouting of leg/pile annuli
4. Cutting of legs or crown weld shims
5. New horizontal braces for the two levels.
 