Crane capacity.
7.12.5 Example: Platform Underwater Repair
The platform is a four-legged jacket platform operating in 21 m of water. The
jacket structure is horizontally braced at four levels with K-diagonal braces. The
platform was inspected immediately after Hurricane Andrew. The inspection
discovered that two midpoint joints, located at EL (
)12 m between the four
legs, were damaged.
Divers performed the wet welding repair work to replace the two damaged
joints.
The repair procedure was:
New joints were designed (see Figure 7.37 )
The proper welding technique was determined by collection of specimens
from jacket structure and measuring the carbon equivalent
Wet welding specimens were tested
The two damaged joints were removed
FIGURE 7.37 New replacement part.