Information Technology Reference
In-Depth Information
5 Conclusions
Nowadays development in information technology is rapid, the old mode of production
cannot meet the needs of modern manufacturing systems. Job-Shop scheduling as the
core of the entire manufacturing system, directly affects the production of finished
products, production cycle, core competitiveness. A good Job-shop Scheduling System
is the key to improve enterprise efficiency. Prototype of this JSSS we designed
represents some more convenient and flexible scheduling plan in test by engineer of an
automobile factory.
Acknowledgment
This is one part of the work, Research on Dynamic Job Shop Scheduling Problem in
Auto-mobile Industry Based on Multi-agent Method , financially supported by Sichuan
Youth Sci. & Tech. Foundation, Number 08ZQ026-009. Thanks for their kindness
assistance. It also is funded by Construction Foundation of Xihua University
Transportation Planning and Management Key Subject , Number XZD0816-09-1.
References
1. Lee, H., Kim, S.: Integration of Process Planning and Scheduling Using Simulation Based
Genetic Algorithms. The International Journal o f Advanced Manufacturing Technology, pp.
586-589 (2001)
2. Mishra, S.: A hybrid least square- fuzzy bacteria foraging strategy for harmonic estimation.
IEEE Trans. Evol. Computer, 1-3 (2005)
3. Fox, M.: Constrain: Directed search: A case study of job shop scheduling (Dissertation).
Carnegie-Mellon University, Pittsburgh (1983)
4. Zhengwen, D., Zhang, A., Wu, I.: An agent-based approach for e- manufacturing and supply
chain integration. Computer & Industrial Engineering, 340-352 (2006) (in Chinese)
5. Feng, L., Ma, H., Song, Z.: Development and Application of Spare Part Management System
of Decision Making. Metallurgical Equipment, 36-38 (2006)
6. Nello, C., John, S.-T.: An Introduction to Support Vector Machines and Other Kernel-based
Learning Methods. Cambridge University Press, Cambridge (2000)
7. Tang, X.-p., Wang, W.-t.: Research on Support Vector Machine for Pattern Classification.
Modern Computer (2007) (in Chinese)
8. Yuan, K., Zhu, J.: Improved genetic algorithm for the flexible job-shop scheduling with
multi-object. Chinese Mechanical Engineering, 150-158 (2007) (in Chinese)
 
Search WWH ::




Custom Search