TABLE 2.4 Example Template for Conducting HAZOP Analysis
Node:
10
Process Stream:
Purified Water System
Drawings:
PFD 1
P&ID 2
Design Conditions/Parameters:
Supply water by batch to process vessel at one of several steps—initialization, quench, final purge, cleaning, makeup
Comments:
Evaluation conducted as part of Design Review.
Risk Matrix
Deviation
Causes
Consequences
Safeguards
S
L RR
Recommendations
Responsibility
Remarks
No flow Flow Valve
fails closed
when open is
required
Inability to supply
water when
needed
1. Valve position
indication
2. Flow indication
FI-YY on line
3. Operator
surveillance
2
4
8 No recommendations—
Safeguards deemed
adequate
N/A
None
No flow Loss of
Pressure on
supply line
Inability to supply
water when
needed
1. Pressure
measurement
PI-XX
2. Operator
surveillance
2
3
6 No Recommendations—
Safeguards deemed
adequate
N/A
None