Environmental Engineering Reference
In-Depth Information
Wholesale electricity prices − UK winter weekday
160
Scenarios 1 and 2
Scenario 3
140
120
100
80
60
40
20
0
2
4
6
8
10
12
14
16
18
20
22
24
Time (h)
Figure 7.3
Electricity spot market prices for an UK winter weekday - case study of
present and future scenarios
Fuel mix emission intensity − UK winter weekday
1
Scenarios 1 and 2
Scenario 3
0.8
0.6
0.4
0.2
0
2
4
6
8
10
12
14
16
18
20
22
24
Time (h)
Figure 7.4
Carbon emissions for each MWh of electricity generated based on the
UK fuel mix - case study of present and future scenarios
7.4
Techno-economical results
7.4.1 Agent-based model results
As said above, the ABM simulation is executed for three days and afterwards the
output data is used to simulate the three scenarios in the TCOPF tool. Table 7.2
provides results of the agents' travelling behaviour as well as the battery status at the
 
Search WWH ::




Custom Search