Environmental Engineering Reference
In-Depth Information
Plug-and-forget scenario
0.6
Node 4
Node 3
Node 2
0.4
0.2
0
2
4
6
8
10
12
14
16
18
20
22
24
Time (h)
Figure 6.12
Dispatch of micro-CHP units for case study 3
Fuel cost scenario
0.8
Node 4
Node 3
Node 2
0.6
0.4
0.2
0
2
4
6
8
10
12
14
16
18
20
22
24
Time (h)
Figure 6.13
Dispatch of micro-CHP units for case study 4
power injections in node 4 tend to be higher than for other nodes, hence reducing
losses in the delivery of power;
The power injections in case 5 are more prominent than in case 4; nevertheless,
the operating times are quite similar by running in the early morning and midday;
The micro-CHP generation for case 5 runs flat out through the day at all points
of the network since the value of electricity is at a premium.
Similar to Figure 6.10, and employing the same legends to refer to each case
study, Figure 6.16 describes the various aggregated thermal storage profiles obtained
 