Plan
Actual
To Date
Defects/Hour
Design Review
Defects/Hour Code
Review
Defects/Hour
Compile
Defects/Hour
Te s t
DRL (DLDR/UT)
DRL (Code
Review/UT)
DRL (Compile/UT)
PSP2 Plan Summary Instructions
Purpose
To hold the plan and actual data for programs or program parts.
General
- Use the most appropriate size measure, either LOC or element count.
- “To Date” is the total actual to-date values for all products developed.
- A part could be a module, component, product, or system.
Header
- Enter your name and the date.
- Enter the program name and number.
- Enter the instructor's name and the programming language you are
using.
Summary
- Enter the added and modified size per hour planned, actual, and to-date.
- Enter the planned and actual times for this program and prior programs.
- For planned time to date, use the sum of the current planned time and
the to-date planned time for the most recent prior program.
-CPI = (To Date Planned Time)/(To Date Actual Time).
 