Information Technology Reference
In-Depth Information
General
Where the design was previously verified, check that
the analyses
- covered all of the design.
- were updated for all design changes.
- are correct.
- are clear and complete.
Step
Activities
Description
1
Preparation
Examine the program and checklist and decide on a
review strategy.
2
Review
- Follow the Design Review checklist.
- Review the entire program for each checklist
category; do not try to review for more than one
category at a time!
- Check off each item as you complete it.
- Complete a separate checklist for each product or
product segment reviewed.
3
Fix Check
- Check each defect fix for correctness.
- Re-review all changes.
- Record any fix defects as new defects and, where
you know the defective defect number, enter it in
the fix defect space.
Exit Criteria
- A fully reviewed detailed design.
- One or more Design Review checklists for every
design reviewed.
- All identified defects fixed and all fixes checked.
- Completed Time and Defect Recording logs.
Code Review Script
Purpose
To guide you in reviewing programs.
Entry Criteria
- A completed and reviewed program design.
- Source program listing.
- Code Review checklist.
- Coding standard.
- Defect Type standard.
- Time and Defect Recording logs.
General
Do the code review with a source-code listing; do not
review on the screen!
 
Search WWH ::




Custom Search