TABLE 10.6
Complex and Large-Size PSP Project Plan Summary
Complex and Large-Size Project Sample
PSP Project Plan Summary Farm
Program Size (LOC):
Plan
Actual
To Date
Base(B)
0
0
(Measured)
(Measured)
Deleted (D)
0
0
(Estimated)
(Counted)
Modified (M)
0
0
( Estimated)
(Counted)
Added (A)
0
0
(N
M)
(T
B
+
D
R)
Reused (R)
10000
8600
0
(Estimated)
(Counted)
Total New & Changed (N)
90000
95000
95000
(Estimated)
(A
+
M)
Total LOC (T)
90000
95000
95000
(N
+
B
M
D
+
R)
(Measured)
Total New Reused
0
0
0
Time in Phase (minute)
Plan
Actual
To Date
To Date %
Planning
4800
4800
4800
0.35
Design
48000
60000
60000
4.37
Design review
12000
14400
14400
1.05
Code
218400
312000
312000
22.73
Code review
96000
108000
108000
7.87
Compile
96000
144000
144000
10.49
Test
480000
720000
720000
52.45
Postmortem
4800
9600
9600
0.70
Total
960000
1372800
1372600
100.00
Defects Injected
Plan
Actual
To Date
To Date %
Planning
0
0
0
0.00
Design
10
8
8
1.04
Design review
0
0
0
0.00
Code
400
360
360
46.88
Code review
0
0
0
0.00
Compile
0
0
0
0.00
Test
300
400
400
52.08
Total Development
710
768
768
100.00
Defects Removed
Plan
Actual
To Date
To Date %
Planning
0
0
0
0.00
Design
0
0
0
0.00
Design review
0
0
0
0.00
Code
0
0
0
0.00
Code review
25
20
20
2.22
Compile
500
400
400
44.44
Test
120
480
480
53.33
Total Development
645
900
900
100.00
After Development
0
0
0
 