Information Technology Reference
In-Depth Information
TABLE 10.4 Moderately Complex and Medium-Size PSP Project Plan Summary
Program Size (LOC):
Plan
Actual
To Date
Base(B)
15000
15000
(Measured)
(Measured)
Deleted (D)
12500
12600
(Estimated)
(Counted)
Modified (M)
2500
3100
( Estimated)
(Counted)
Added (A)
7600
7100
(N-M)
(T-B + D-R)
Reused (R)
0
0
0
(Estimated)
(Counted)
Total New & Changed (N)
10000
10200
0
+
(Estimated)
(A
M)
Total LOC (T)
10000
9500
9500
(N
+
B-M-D
+
R)
(Measured)
Total New Reused
0
0
0
Time in Phase (minute)
Plan
Actual
To Date
To Date %
Planning
480
480
480
0.42
Design
7200
7200
7200
6.25
Design review
3300
2400
2400
2.08
Code
90420
57120
57120
49.58
Code review
3300
2400
2400
2.08
Compile
12900
9600
9600
8.33
Test
34560
34560
34560
30.00
Postmortem
1440
1440
1440
1.25
Total
153600
115200
115200
100.00
Defects Injected
Plan
Actual
To Date
To Date %
Planning
0
0
0
0.00
Design
10
10
12
2.38
Design review
0
0
0
0.00
Code
0
12
15
2.97
Code review
0
78
90
17.82
Compile
200
340
378
74.85
Test
0
0
10
1.98
Total Development
210
440
505
100.00
Defects Removed
Plan
Actual
To Date
To Date %
Planning
0
0
0
0.00
Design
0
0
0
0.00
Design review
0
0
0
0.00
Code
2
0
0
0.00
Code review
3
5
5
55.56
Compile
0
0
0
0.00
Test
3
4
4
44.44
Total Development
8
9
9
100.00
After Development
0
0
0
 
Search WWH ::