Information Technology Reference
In-Depth Information
TABLE 10.2
Simple and Small-Size PSP Project Plan Summary
Simple and Small Size Project
PSP Project Plan Summary
Program Size (LOC):
Plan
Actual
To Date
Base(B)
0
0
(Measured)
(Measured)
Deleted (D)
0
0
(Estimated)
(Counted)
Modified (M)
200
190
(Estimated)
(Counted)
Added (A)
800
900
(N
M)
(Counted)
Reused (R)
0
0
(Estimated)
(Counted)
Total New & Changed (N)
0
1090
0
(Estimated)
(A
+
M)
Total LOC (T)
1000
1090
1090
(N
+
B
M
D
+
R)
(Measured)
Total New Reused
0
0
0
Time in Phase (minute)
Plan
Actual
To Date
To Date %
Planning
480
480
480
3.33
Design
3600
2400
2400
16.67
Design review
480
480
480
3.33
Code
3600
2400
2400
16.67
Code review
1200
1200
1200
8.33
Compile
960
960
960
6.67
Test
7920
6000
6000
41.67
Postmortem
960
480
480
3.33
Total
19200
14400
14400
100.00
Defects Injected
Plan
Actual
To Date
To Date %
Planning
0
0
0
0.00
Design
2
2
2
6.25
Design review
0
0
0
0.00
Code
20
27
27
84.38
Code review
0
0
0
0.00
Compile
0
0
2
6.25
Test
0
0
1
3.13
Total Development
22
29
32
100.00
Defects Removed
Plan
Actual
To Date
To Date %
Planning
0
0
0
0.00
Design
0
0
0
0.00
Design review
0
0
0
0.00
Code
0
0
1
25.00
Code review
0
5
0
0.00
Compile
4
0
2
50.00
Test
2
1
1
25.00
Total Development
6
6
4
100.00
After Development
0
0