PSP0: You establish a measured performance baseline
PSP1: You make size, resource, and schedule plans
PSP2: You practice defect and yield management
PSP3: A Cyclic Personal Process
FIGURE 10.3
PSP3 evolution (Kristinn et al., 2004).
10.3
THE TEAM SOFTWARE PROCESS (TSP)
Using PSP3, programs can be built with more than 10 KLOCs. However, there are two
problems: First, as the size grows so does the time and effort required, and second,
most engineers have trouble visualizing all the important facets of even moderately
sized programs. There are so many details and interrelationships that they may
Personal
Quality
Management
PSP3
Cyclic development
PSP2
Code reviews
Design reviews
Personal
Quality
Management
PSP2.1
Design
Templates
PSP1
Size estimating
Test report
Personal
Planning
Process
PSP1.1
Task planning
Schedule planning
PSP0
Current process
Time recording
Defect recording
Defect type standard
PSP0.1
Baseline
Personal
Process
Coding standard
Size measurement
Process improvement
Proposal (PIP)
FIGURE 10.4
PSP evolution (Kristinn et al., 2004).