Project
Summary
PM
Project and process
Data summary report
Finished project
FIGURE 10.1
The PSP0 process flow (Humphrey, 1999).
PSP1: Personal Planning Process PSP1 adds planning steps to PSP0 as shown
in Figure 10.2. The initial increment adds test report, size, and resource estima-
tion. In PSP1, task and schedule planning are introduced.
The intention of PSP1 is to help understand the relation between the size of
the software and the required time to develop it, which can help the software
professional make reasonable commitments. Additionally, PSP1 gives an orderly
plan for doing the work and gives a framework for determining the status of the
software project (Humphrey, 1997).
Requirements
Planning
Design
Code
Compile
Te s t
Postmortem
Finished product
Project and process data
summary report
FIGURE 10.2
PSP1—Personal planning process (Humphrey, 1997).
 