Information Technology Reference
In-Depth Information
D - Define Phase: Define the project goals and customer (internal and external)
deliverables.
Define Customers and Requirements
(CTQs)
Project Charter
Develop Problem Statement, Goals, and
Benefits
Process Flowchart
SIPOC Diagram
Identify Champion, Process Owner, and
Team
Stakeholder Analysis
DMAIC Work Breakdown Structure
Define Resources
CTQ Definitions
Evaluate Key Organizational Support
Voice of the Customer Gathering
Develop Project Plan and Milestones
Develop High-Level Process Map
M - Measure Phase: Measure the process to determine current performance; quantify the
problem.
Define Defect, Opportunity, Unit, and
Metrics
Process Flowchart
Detailed Process Map of Appropriate Areas
Data Collection Plan/Example
Develop Data Collection Plan
Benchmarking
Validate the Measurement System
Measurement System Analysis/Gage
R&R
Collect the Data
Begin Developing Y = f(x) Relationship
Voice of the Customer Gathering
Determine Process Capability and Sigma
Baseline
Process Sigma Calculation
A - Analyze Phase: Analyze and determine the root cause(s) of the defects.
Histogram
Pareto Chart
Define Performance Objectives
Time Series/Run Chart
Identify Value/Non-Value-Added Process
Steps
Scatter Plot
Regression Analysis
Identify Sources of Variation
Cause-and-Effect/Fishbone Diagram
Determine Root Cause(s)
5 Whys
Determine Vital Few x's, Y = f(x) Relationship
Process Map Review and Analysis
Statistical Analysis
Hypothesis Testing (Continuous and
Discrete)
Non-Normal Data Analysis
I - Improve Phase: Improve the process by eliminating defects.
Perform Design of Experiments
Brainstorming
Develop Potential Solutions
Mistake Proofing
Define Operating Tolerances of Potential
System
Design of Experiments
Pugh Matrix
Assess Failure Modes of Potential Solutions
House of Quality
Validate Potential Improvement by Pilot
Studies
Failure Modes and Effects Analysis
(FMEA)
Correct/Re-Evaluate Potential Solution
Simulation Software
C - Control Phase: Control future process performance.
Define and Validate Monitoring and Control
System
Develop Standards and Procedures
Implement Statistical Process Control
Process Sigma Calculation
Determine Process Capability
Control Charts (Variable and
Attribute)
Develop Transfer Plan, Handoff to Process
Owner
Cost-Savings Calculations
Verify Benefits, Cost Savings/Avoidance,
Profit Growth
Control Plan
Close Project, Finalize Documentation
Communicate to Business, Celebrate
FIGURE 7.14
DMAIC steps and tools.
Search WWH ::




Custom Search