Graphics Programs Reference
In-Depth Information
currently set to the default, which is Fixed
Width.
Figure 2-26: Steep slope because of
Grading Method set to Fixed Width
8. Change Grading Method to Fixed Slope.
After a pause, the roadside grading will
change. Now there is a 3:1 slope projected
from the edge of the road until it reaches the
grading limit. After that, the embankment
slope becomes a vertical face (see Figure
2-27 ).
Search WWH ::




Custom Search