Databases Reference
In-Depth Information
Table
20-4
lists all the options of the
change failure
command.
Table 20-4.
Options of Change Failure
Option
Description
all
Changes all failures with an
open
status
critical
Changes all failures with a
critical
status
high
Changes all failures with a
high
status
low
Changes all failures with a
low
status
failure number
Changes a specific failure
exclude failure
<failure number>
Excludes a failure from the operation
closed
Changes the status to
closed
priority high
Changes the priority to
high
priority low
Changes the priority to
low