Information Technology Reference
In-Depth Information
Cover Page
Table of Contents
1.0
INTRODUCTION
1.1
Purpose
1.2
System Overview
1.2.1
System Design
1.2.2
System Organization
1.3
Project References
1.4
Glossary
2.0
MANAGEMENT OVERVIEW
2.1
Description of Implementation
2.2
Points of Contact
2.3
Major Tasks
2.4
Implementation Schedule
2.4.1
System Security Features
2.4.2
Security during Implementation
3.0
IMPLEMENTATION SUPPORT
3.1
Hardware, Software, Facilities, and Materials
3.1.1
Hardware
3.1.2
Software
3.1.3
Facilities
3.1.4
Material
3.2
Personnel
3.2.1 Personnel Requirements and Staffing
3.2.2 Training and Implementation
3.3
Performance Monitoring
Fig. 9.2
Outline of implementation plan
in the Integration and Test Phase, and is used for guidance during the Imple-
mentation Phase. The outline below, Fig. 9.2 , shows the structure of the Imple-
mentation Plan (IRM 2003 ).
9.2.2 New Model Training Plan
It is always a good business practice to provide training before the end user uses
the new system. Because there has been a previously designed training plan
established, complete with the system user manual, the execution of the plan
should be relatively simple. Typically what prevents a plan from being imple-
mented is a simple lack of funding. Good budgeting practices should prevent this
from happening.
Search WWH ::