Estimated Injected
Fluid Volumes
Tables L.1-L.5 contain the data used to create Figure 3.16.
TABLE L.1 Hydraulic Fracturing Volumes
Average Volume
Water (gal)
Volume Water Use
Per Well (gal)
Volume Water Use
Per Well (m 3 )
Development Area
Barnett
4,600,000
2,800,224
10,600
Eagle Ford
5,000,000
4,253,170
16,100
Haynesville
5,000,000
5,679,699
21,500
Marcellus
5,600,000
No data
No data
Niobrara
3,000,000
No data
No data
Average volume per well per day
4,640,000
NOTE: “Daily” hydraulic fracture volume plotted assumes the hydraulic fracturing procedure would take
2 days to complete; the 1-day volume plotted is half the total well volume estimated by King (2012).
“Yearly” hydraulic fracture volume assumes 15 wells per year in the development area. Postfracturing
flowback volume is assumed to be 20 percent of the total volume injected.
SOURCE: King (2012); Nicot and Scanlon (2012).
 