subcontractor. A contractor may need a dozen copies of a project's plans and specifications to distribute to
the various subcontractors.
Table 2.1 MasterFormat TM specification divisions
Group
Division
Number
Procuring and Contracting Requirements
Procurement and Contracting requirements
00
Specifications Group
General Requirements
01
Facility Construction Subgroup
Division
Number
Division
Number
Existing Conditions
02
Finishes
09
Concrete
03
Specialties
10
Masonry
04
Equipment
11
Metals
05
Furnishings
12
Wood, Plastics, and Composites
06
Special Construction
13
Thermal and Moisture Protection
07
Conveying Equipment
14
Openings
08
Facility Services Subgroup
Division
Number
Division
Number
Fire Suppression
21
Electrical
26
Plumbing
22
Communications
27
HVAC
23
Electronic Safety and Security
28
Integrated Automation
25
Site and Infrastructure Subgroup
Division
Number
Division
Number
Earthwork
31
Transportation
34
Exterior Improvements
32
Waterway and Marine Construction
35
Utilities
33
Process Equipment Subgroup
Division
Number
Division
Number
Process Integration
40
Pollution Control Equipment
44
Material Processing and Handling
Equipment
41
Industry-specific Manufacturing
Equipment
45
Process Heating, Cooling, and Drying
Equipment
42
Electrical Power Generation
48
Process Gas and Liquid Handling,
Purification, and Storage Equipment
43