FIGURE 9.21a
Bolted beam framing moment connection.
P
Coped flange
t
a
h
Side elevation
FIGURE 9.21b
Bolted beam framing connection subject to block shear.
A rigid connection may be designed for the shear force,
P
, and the corresponding
end moment due to full fixity,
M
f
. A semirigid connection will require consideration
of the end moment
(M
e
)
-end rotation (
φ
e
) relationship (often nonlinear) to determine
rotational stiffness and the end moment for design. Moment-rotation curves, devel-
oped from theory and experiment, for bolted joint configurations
∗