5.3
Consider two periodic tasks with computation times
C
1
=1,
C
2
=2and
periods
T
1
=5,
T
2
=8, handled by Rate Monotonic. Show the schedule
produced by a Polling Server, having maximum utilization and intermediate
priority, on the following aperiodic jobs:
a
i
C
i
J
1
2
3
J
2
7
1
J
3
17
1
5.4
Solve the same scheduling problem described in Exercise 5.3, with a Sporadic
Server having maximum utilization and intermediate priority.
5.5
Solve the same scheduling problem described in Exercise 5.3, with a Deferrable
Server having maximum utilization and highest priority.
5.6
Using a Sporadic Server with capacity
C
s
=2and period
T
s
=5, schedule the
following tasks:
aperiodic tasks
a
i
periodic tasks
C
i
C
i
T
i
J
1
2
2
τ
1
1
4
J
2
5
1
τ
2
2
6
J
3
10
2