Table 3 0-1. Benefits of the DB project delivery approach
Risk Allocation
Design-builder assumes the risk to deliver and the owner's risk is reduced.
Risks are allocated where they can be best managed.
Minimizes project risk for owner.
Project responsibility decisions including professional design, quality control,
and general inspection are with the design-builder, who must provide a
comprehensive warranty covering workmanship repairs and defects.
(continued)