to accelerate responses to questions or to communicate changes with greater efficiency.
In addition, BIM, when used in conjunction with DB, can bring the entire team together
early in the design so that valuable early information from every team member can be
incorporated into the planning and design process.
Design-build, more than any other delivery method, provides opportunities for both
owners and industry practitioners to leverage the benefits derived from these new ways of
doing business. In addition, DB can structure the most effective reward arrangements to
optimize team innovation and motivation.
As captured in the Penn State/Construction Industry Institute (CII) study by Konchar
and Sanvido, (1998), DB has demonstrated its mastery of cost containment (e.g., 6 percent
lower cost than DBB), reduction in construction time (e.g., 13 percent faster than DBB),
and overall schedule (i.e., 33 percent faster than DBB). Also, as indicated in the research
titled Independent Comparative Evaluation of Design-Build V. Conventional Design-Bid-
Build Project Delivery for Municipal Water and Wastewater Facilities, conducted by the
University of New Mexico, University of Colorado, and Iowa State University (Bogus,
Shane, and Molenaar 2009), DB had shorter project durations and 50 percent less sched-
ule growth than DBB.
These superior performance outcomes are not the result of serendipity. They are the
result of many hundreds of years of hard-earned lessons learned.
REFERENCES
Baur, S. W. 2007. The History of the Ancient World: From the Earliest Accounts to the Fall
of Rome . New York: W.W. Norton and Company.
Bogus, S. M., J. Shane, and K. Molenaar. 2009. Independent Comparative Evaluation of
Design-Build V. Conventional Design-Bid-Build Project Delivery for Municipal Water and
Wastewater Facilities. Washington, D.C.: Water Design-Build Council.
Cushman, R. F., and M. C. Loulakis. 2001. Design-Build Contracting Handbook, 2nd ed.
New York: Aspen Publishers.
Henner, J. 2007. Legal and Contractual Issues in Military Design Build Projects . Paper
presented at the N.C. State University Military Design/Build Forum. May 21.
Konchar, M., and V. Sanvido. 1998. Comparison of U.S. Project Delivery Systems . Jour-
nal of Construction Engineering and Management, American Society of Civil Engineers,
124(6):435-444.
Thomsen, C. 2008. Program Management: Concepts and Strategies for Managing Capital
Building Programs. McLean, Va.: Foundation of the Construction Management Associa-
tion of America.
Van Simson, O. 1988. The Gothic Cathedral: Origins of Gothic Architecture and the Medi-
eval Concept of Order, 3rd ed. Princeton, N.J.: Princeton University Press.
Search WWH ::




Custom Search