Figure 1.
General plant and Geological plant. Major civil engineering works constructed along the highway.
Table 1.
Major special engineering structures and support structures characteristics.
Width
(m)
cross
section (m 2 )
Max.
covering (m)
Geological
conditions
Tunnel
Total length (m)
Queimada ii
9
75
745
95
β 2
access Road a
7
57
202
70
β 2
Piquinho
9
75
35
2 × 449
β 1 and β 2
Fazenda
9
75
2 × 163
30
β 2
a.Road e
7
57
185
40
β 2
caniçal
9
75
2 × 2100
>300
β 1 and β 2
Portais
9
75
100
2 × 682
β 2
Palmeira
9.6
83
60
2 × 915
β 1 and β 2
a - Tunnels.
Table 1a.
Major special engineering structures and support structures characteristics.
Total length
(m)
Geological
conditions
Type of
foundation
name
south Machico
interchange Viaducts
60/60
β 2
Footings
Terça Viaduct
75/72
Footings
and piles
β 2
Machico Bridge
215,9/207.1
Micro piles
β 2 and β 1
entre-aguas Bridge
234,4/219.4
Footings
β 2
B - Bridges and viaducts.
 
 