the public 6 months prior to the time for the Bank's loan approval, thereby giving
NGOs and others interested an invitation to submit comments to be considered.
This procedure is illustrated in Box 4.6, “Recommended DC/EIA Report Table
of Contents”.
BOX 4.6 RECOMMENDED DC/EIA REPORT TABLE OF
CONTENTS
PREFACE
General Table of Contents
Abbreviations Utilized in Report
EXECUTIVE SUMMARY (ES)
CHAPTERS
1. INTRODUCTION
1.1. Project Background
1.2. Purpose of EIA Report
1.3. EIA Methodology
1.4. Environmental Study Area (ESA)
1.5. Relation to Project Feasibility Study
1.6. EIA Team
1.7. Pertinent Reference
1.8. Work Plan/Tesks
1.9. Task Scheduling
1.10. Report Preparation
1.11. Summary
2. PROJECT DESCRIPTION
2.1. Introduction
2.2. Project Production Components
2.3. Environmental Production Components
2.4. Project Time Frame
2.5. Required Permits from Governmental Agencies
2.6. Due Diligence
2.7. Training Program
2.8. Use of Local Personal
2.9. Special Amenities
2.10. Summary