Fig.13.10TheHubbertPeakappliedtoAustraliansilverreserves
800
0.9
Exergy cost
Ore grade
0.8
700
0.7
600
0.6
500
0.5
400
0.4
300
0.3
200
0.2
100
0.1
0
0
Year
Fig. 13.11
Ore grade and exergy replacement cost of Australian lead mines
Fig. 13.12 shows the Hubbert Peak Model applied to lead. The theoretical peak
year is reached in 1994, considering that the economic demonstrated reserves are
R 1859 = 57:9 Mtoe. The regression factor is RF = 0:84. It should be noted that
the production points for the latest years (1998 - 2007) do not fall under the curve.
According to production data, the real peak might have been reached in 2002 which