The first part of objective function's three terms indicates the manufacturing
operation costs, the machine setup costs, and the MH operation costs, respec-
tively. The second part of the objective function computes the overall compat-
ibility of the MH equipment. As a result, the formulation of the problem is a
multiobjective model seeking to strike a balance between the two objectives.
There are nine constraints in this model:
1.
Each part type can use only one process plan:
P(i)
Z(ip)
=
1
∀
i.
(3)
p
=
1
2.
For a given part type
i
under process plan
p
, each operation of the selected
process plan is assigned to only one of the available machines:
Y
sj
(ip)
=
Z(ip)
∀
i, p, s.
(4)
j
∈
J
ips
3.
Once a machine is selected for operation
s
of part type
i
under process
plan
p
, then all the (
h h
) combinations corresponding to (
sj
)mustbe
performed:
i, p, s, j, h, h.
(5)
4.
Each
h h
combination can be assigned to only piece of available and
capable MH equipment:
Y
sj
(ip)
=
A
sj h h
(ip)
∀
i, p, s, j, h, h.
X
ijph he
=
A
ijph h
∀
(6)
e
∈
E
jhh
5.
At least one operation must be allocated to a selected machine:
H
P(i)
S(ip)
n
H
X
ijph he
≥
M
j
∀
j.
(7)
i
=
1
p
=
1
s
=
1
h
=
1
h
e
∈
E
jhh
=
1
6.
The allocated operations cannot exceed the corresponding machine's
capacity:
H
n
P(i)
S(ip)
H
d
i
t
sj
(ip)X
ijph he
≤
b
j
M
j
∀
j.
(8)
e
∈
E
jhh
i
=
1
p
=
1
s
=
1
h
=
1
h
=
1
7.
A specific MH equipment can be selected only if the corresponding
type
of equipment is selected:
D
e
≤
D
e
∀
e, e.
(9)