The first part of objective function's three terms indicates the manufacturing
operation costs, the machine setup costs, and the MH operation costs, respec-
tively. The second part of the objective function computes the overall compat-
ibility of the MH equipment. As a result, the formulation of the problem is a
multiobjective model seeking to strike a balance between the two objectives.
There are nine constraints in this model:
1. Each part type can use only one process plan:
P(i)
Z(ip)
=
1
i.
(3)
p = 1
2. For a given part type i under process plan p , each operation of the selected
process plan is assigned to only one of the available machines:
Y sj (ip)
=
Z(ip)
i, p, s.
(4)
j
J ips
3. Once a machine is selected for operation s of part type i under process
plan p , then all the ( h h ) combinations corresponding to ( sj )mustbe
performed:
i, p, s, j, h, h. (5)
4. Each h h combination can be assigned to only piece of available and
capable MH equipment:
Y sj (ip)
=
A sj h h (ip)
i, p, s, j, h, h.
X ijph he =
A ijph h
(6)
e
E jhh
5. At least one operation must be allocated to a selected machine:
H
P(i)
S(ip)
n
H
X ijph he
M j
j.
(7)
i
= 1
p
= 1
s
= 1
h
= 1
h
e
E jhh
= 1
6. The allocated operations cannot exceed the corresponding machine's
capacity:
H
n
P(i)
S(ip)
H
d i
t sj (ip)X ijph he
b j M j
j.
(8)
e
E jhh
i
= 1
p
= 1
s
= 1
h
= 1
h
=
1
7. A specific MH equipment can be selected only if the corresponding type
of equipment is selected:
D e
D e
e, e.
(9)
 