Geography Reference
In-Depth Information
Fig. 7.3
Joint activity opportunities
U.
opp
k
; G.t //
D
max
(
X
i
2
STP
j
CI
.e
i
;Œ0;t/
!
=
linknum
STP
j
ˇ
ˇ
ˇ
2
ST
P.k;
kst
/
)
STP
j
(7.12)
where
linknum
(
STP
j
) represents the link number of the
j
th shortest space-time path
for
op
portunity
k
,
STP
j
is a space-time path in the shortest space-time path set
STP.k;kst/,and
kst
is a user-defined constant which indicates the number of
the
kst
shortest space-time paths for opportunity
k
.
An opportunity with a utility index value within the fi
rst
kst
maximum utility
index values
U
(
opp
k
,
G
(
t
)) of its corresponding path set STP.k;kst/is referred to
here as a critical activity opportunity.
Therefore, two steps are required to identify critical activity opportunities for
scheduling joint participation. The first step is to identify the first
kst
shortest
space-time paths for each opportunity in the TVNBP. The second step is to
find the critical activity opportunity by finding the activity with the highest ratio
U
(
opp
k
,
G
(
t
))/
criterion
(
STP
j
) among all available activity opportunities, where
criterion
(
STP
j
) is the value of the specific evaluation criterion (e.g., travel distance,
travel time) for opportunity
k
's critical activity.
Search WWH ::
Custom Search