Civil Engineering Reference
In-Depth Information
During the assessing examination, after drain openings had been cleaned some water
was poured off the anchor device (Figure 6.16). This permanently wet environment had
accelerated the corrosion of the compound-filled cable ends.
Figure 6.16 Anchor device for the
load-bearing cables before
reconstruction
After examining the actual geometric shape of the cable system (Figure 6.17), a static
calculation was carried out to check its status.
Figure 6.17 The structure of the
pipeline bridge
Search WWH ::